News
» Go to news mainIMPORTANT PARKING LOT CLOSURE
If you park in the Rosina lot on Sexton campus please note that paving will take place from Tuesday, August 1 until Saturday, August 5.
The paving will be done in two phases so that half the parking lot will still be available. The half closest to Morris Street will be done first. We apologize for the disruption, but expect there will be more available spaces at the end of the project when the lines are painted to maximize the space.
Ìý
FURTHER CONSTRUCTION ANNOUCEMENTS
Also note that effective Monday, 29 July 2017,Ìýthe East side door (the one facing the quad that goes to alumni lounge) of D building will be closed to normal traffic. ÌýThe closure is due to safety concerns.Ìý
This door will remain useable as an EMERGENCY EXIT ONLY. ÌýPeople wishing to exit may do so via the North door of D (onto the roadway), or via N building.
The closure is expected to remain in effect until 2 September 2017.
Thank you for your understanding.Ìý
Recent News
- Dr. Paul Amyotte, P.Eng. Honoured as Discovery Centre Hall of Fame Award Winner
- Jon Totten’s Unexpected Journey to Teaching Excellence
- Dal Solutions: Breakthrough poised to transform wastewater treatment worldwide
- Grad Profile: A Revolutionizing Journey in Additive Manufacturing
- A Solar Journey: Jessica Durham’s First Year at HÂþ» Engineering
- Celebrating Excellence: HÂþ» Faculty Recognized for Remarkable Achievements
- Breaking Boundaries: Dr. Noreen Kamal Showcases Global Innovation Through Equity and Inclusion
- Justin D’Entremont’s Work Term with The LEGO Group